Freight Wheel Drop Tables

CN Fulton Drop Table

The world’s first mainline siding drop table. Allows for the direct changeout of wheels on full-length trains without switching out rail cars to a local repair facility. The latest adaptation of our proven design.

CN MacMillan Drop Table

LRDL’s flagship high-speed freight car wheel changeout drop table. Safe, efficient, PLC-automated facility. Modern operator interfaces and user-friendly operation. North America’s fastest wheel changeout operation at 3.5 minutes per wheelset.

CN Prince George North Drop Table

Fourth installation of a high speed semi-automatic freight wheel changeout system. In-house design and construction. Separate control room built under a controlled environment at RSSI headquarters. Complete installation services including design, simulations, procurement, construction, and management of yard utilities, such as high line power.

Get the job done.

There's no reason to quit, even if a project is difficult or tiring. LRDL and RSSI see all projects through to completion. Our objective is to remain valuable to our clients: our reward is repeat business.